获取报价
首页 > 产品 > 按类型 > 离心风机 > R2E270-AA01-09 | ebm-papst 230V 430W Centrifugal Fan for Automation

R2E270-AA01-09 ebm-papst 离心风机

品牌:
ebmpapst
型号:
R2E270-AA01-09 | ebm-papst 230V 430W Centrifugal Fan for Automation
类型:
离心风机
应用行业:
自动化
产品描述:

Built for Automation, ebm-papst R2E270-AA01-09 is a 230 V AC forward-curved centrifugal fan, featuring a documented speed of 3,100 rpm. It supports replacement and design review. Its documented data supports integration planning.

规格书:
R2E270-AA01-09 | ebm-papst 230V 430W Centrifugal Fan for Automation 规格书 (Pdf)

产品特点

Rated Voltage(V)230
Size(mm)270
Max.Air Flow(m³/h)2760
Max.Pressure(Pa)560
Input Power(W)430
Speed(rpm)3100

产品特点

Reliable AC Cooling

R2E270-AA01-09 is an ebm-papst AC centrifugal fan for Automation, where controlled heat removal and airflow management must match the actual duty point. Its model-specific format supports OEM builds, retrofit planning and replacement sourcing.

Documented selection points include 230 V supply, 430 W input, 270 mm size, up to 2760 m3/h airflow. These values support electrical, envelope and duty-point comparison.

For procurement, verify voltage, duty point, dimensions, connector and mounting. Correct sizing and clear airflow paths support stable operation, controlled noise and long service life. Confirm speed control, IP protection and approvals in the exact-model datasheet. It supports applications that prioritize reliable operation and maintainable design.

应用行业

常见问题

What should be inspected if airflow drops on the R2E270-AA01-09?

Check for blocked airflow paths, incorrect supply, loose wiring, abnormal rotation or system resistance before consulting the exact service documentation.

Which equipment can use the R2E270-AA01-09?

It is listed for Automation. Confirm voltage, duty point, dimensions and mounting against the equipment requirements before selection.

How should buyers select the R2E270-AA01-09 for an operating point?

Match required airflow and pressure on the exact performance curve, then verify voltage, power, dimensions and environmental limits.

Can the R2E270-AA01-09 help control total ownership cost?

Correct sizing and operation within documented limits can reduce avoidable thermal stress and maintenance events; project savings require duty-cycle analysis.

在线留言